AWI Standards

StandardsAWI 100 - Submittals

AWI 100 - Submittals

3.3 General Contractor Responsibility

a) The work of all other trades and assurance that the hold-to/guaranteed dimensions remain enforced is that of the general contractor, not of the /supplier and/or installer. The general contractor is responsible for communication of design and field changes to all parties so that, if dimensions are changed, each subcontractor can be held responsible for their work

Optimum Climate Controlled Relative Humidity table
Figure 2
Figure 3
Figure 4