ANSI/AWI 0620-2018 - Finish Carpentry/Installation

4.0 Figures/Illustrations


Figure 5 – Compliance Testing Measurement

 

Figure 6 – Gaps at Field Joints

 

Figure 7 – Flushness of Field Joints

 

Figure 8 – Scribe Filler

 

Figure 9 – Scribe Moulding

 

Figure 10 – Scribe Allowance

 

Figure 11 – Wall Mount Splash

 

Figure 12 – Countertop Mount Splash

 

Figure 13 – Panel Reveal

 

Figure 14 – Panel Flushness

 

Figure 23 – Overlap

 

Figure 25 – Over-Filing / Over-Machining

 

Figure 30 – Gaps and Flushness, Casework

 

Figure 41 – Closure, Laminate

 

Figure 42 – Closure, Filler

 

Figure 43 – Gaps, Reveal Overlay Frameless

 

Figure 44 – Gaps, Flush Overlay Frameless

 

Figure 45 – Gaps, Reveal Overlay Face Frame

 

Figure 46 – Gaps, Inset Face Frame

 

Figure 51 – Gaps and Flushness, Wall and Ceiling Surfaces

 

Figure 52 – Gaps and Flushness, Countertops

 

Figure 53 – Gaps and Flushness, Standing and Running Trim

 

 

Figure 54 – Flushness, Door and Drawer Front Faces