3.0 Requirements

3.1 General

a) The following requirements shall govern unless a project’s contract documents require otherwise.

b) Should a conflict be discovered within this standard, the least restrictive requirement shall prevail.

c) When applicable, manufacturer/supplier shall verify field measurements.

d) Unless otherwise indicated, requirements apply equally to all performance duty levels/aesthetic grades.

3.1.1 Measurements

a) This standard is written with the metric system of measurement followed by the U.S. Customary System of measurement in brackets.

b) The system of measurement used in the project’s original contract documents and architectural drawings will dictate which system of measurement within these standards is used for verification of compliance.

c) The U.S. Customary measurement is typically a  of the metric measurement. In order to make the metric number more conceptually coherent and consistent, most conversions for less than 152.4 mm [6”] in dimension are “soft” converted to the nearest 0.1 mm. For measurements above 152.4 mm [6”], the “soft” value is converted to the nearest 1 mm.

d) “Inconspicuous,” when used in this standard, means not readily visible without careful inspection at a distance of:

Premium Custom Economy
610 mm [24″] 1219 mm [48″] 1829 mm [72″]

e) Gaps and flushness between components shall be tested with a feeler gauge at points where components are required to contact as indicated within this standard.

3.1.2 Special Requirements

a) When seismic construction is required, such requirements and details shall be clearly stated in the contract documents.
b) Requirements for Product, such as moisture resistant or fire retardant materials, shall be specified by the design professional.

3.1.3 Environmental Conditions

a) Requirements of this standard are contingent upon maintaining proper interior environmental controls prior to, during, and after installation. See the AWI 200 – Care & Storage Standard.

3.1.4 Manufacturer/Supplier Requirements for Installation

a) Manufacturer/supplier shall provide documented instructions for Product installation. In the absence of documented instructions, casework installation shall defer to AWI’s Casework Installation Guidelines (available for download at Click here ).

b) Installation of Product shall be in accordance with the ANSI/AWI 0620-2018 – Finish Carpentry/Installation Standard.

c) Manufacturer/supplier shall provide drawings indicating location of blocking. See the AWI 100 – Submittals Standard.

d) Manufacturer/supplier shall provide documented instructions for the fastening methods of  cabinets. Documented instructions shall include fastener details.

3.1.5 Default Grade Requirements

a) Unless otherwise specified, Product shall comply with the following minimum defaults:

• Structural Performance: Duty Level 3

• Aesthetic Performance: 

Optimum Climate Controlled Relative Humidity table
Figure 2
Figure 3
Figure 4
Figure 66
Figure 67
Figure 65
3-3-4-1 Epoxy Resin
3-3-4-5 Solid Phenolic
tr-op-table
awi-fig5
ANSIAWI 0620-2018-awi-fig6
ANSIAWI 0620-2018-awi-fig7
awi-fig8
awi-fig9
awi-fig10
awi-fig11
awi-fig12
ANSIAWI 0620-2018-awi-fig13
ANSIAWI 0620-2018-awi-fig14
ANSIAWI 0620-2018-awi-fig23
ANSIAWI 0620-2018-awi-fig25
awi-fig30.ashx
awi-fig41
awi-fig42
ANSIAWI 0620-2018-awi-fig43
awi-fig44
awi-fig45
awi-fig46
ANSIAWI 0620-2018-awi-fig51
ANSIAWI 0620-2018-awi-fig52
ANSIAWI 0620-2018-awi-fig53
ANSIAWI 0620-2018-awi-fig54
formula
awi-fig87
awi-fig5
awi-fig8
awi-fig9
awi-fig10
awi-fig15
awi-fig16
awi-fig17
ANSIAWI 0641-2019-awi-fig18
ANSIAWI 0641-2019-awi-fig19
ANSIAWI 0641-2019-awi-fig20
ANSIAWI 0641-2019-awi-fig21
ANSIAWI 0641-2019-awi-fig22
ANSIAWI 0641-2019-awi-fig23
ANSIAWI 0641-2019-awi-fig24
ANSIAWI 0641-2019-awi-fig25
ANSIAWI 0641-2019-awi-fig26
ANSIAWI 0641-2019-awi-fig27
ANSIAWI 0641-2019-awi-fig28
ANSIAWI 0641-2019-awi-fig29
awi-fig30
ANSIAWI 0641-2019-awi-fig31
ANSIAWI 0641-2019-awi-fig32
awi-fig33
awi-fig34
awi-fig35
ANSIAWI 0641-2019-awi-fig36
awi-fig41
awi-fig42
ANSIAWI 0641-2019-awi-fig43
awi-fig44
awi-fig45
awi-fig46
ANSIAWI 0641-2019-awi-fig72
ANSIAWI 0641-2019-awi-fig85
awi-fig86
awi-fig88
awi-fig89
awi-fig90
awi-fig91
awi-fig92
awi-fig93
awi-fig94
awi-fig95
awi-fig96
awi-fig97
awi-fig98
awi-fig99
awi-fig100
awi-fig102
ANSIAWI 1232-2022-awi-fig5
awi-fig8
awi-fig9
awi-fig10
ANSIAWI 12322022-awi-fig15
ANSIAWI 12322022-awi-fig16
ANSIAWI 1232-2022-awi-fig18
ANSIAWI 1232-2022-awi-fig19
ANSIAWI 1232-2022-awi-fig20
ANSIAWI 1232-2022-awi-fig22
ANSIAWI 1232-2022-awi-fig23
ANSIAWI 1232-2022-awi-fig24
ANSIAWI 1232-2022-awi-fig25
ANSIAWI 1232-2022-awi-fig26
ANSIAWI 1232-2022-awi-fig27
awi-fig28
ANSIAWI 1232-2022-awi-fig29
awi-fig30
ANSIAWI 1232-2022-awi-fig32
awi-fig33
awi-fig34
ANSIAWI 1232-2022-awi-fig35
awi-fig36
ANSIAWI 1232022-awi-fig41
awi-fig42
ANSIAWI 1232-2022-awi-fig43
awi-fig44
awi-fig45
awi-fig46
ANSIAWI 1232-2022-awi-fig72
awi-fig86
ANSIAWI 1232022-awi-fig103
ANSIAWI 1232022-awi-fig104
ANSIAWI 1236-2022-awi-fig5
awi-fig11
awi-fig12
ANSIAWI 1236-2022-awi-fig23
ANSIAWI 1236-2022-awi-fig24
ANSIAWI 1236-2022-awi-fig25
ANSIAWI 1236-2022-awi-fig43
ANSIAWI 1236-2022-awi-fig47
ANSIAWI 1236-2022-awi-fig48
awi-fig50
ANSIAWI 1236-2022-awi-fig110
ANSIAWI 1236-2022-awi-fig111
ANSIAWI 1236-2022-awi-fig112